8/58 Lexton Road Box Hill North 3129

Maroondah Highway

60-62 Maroondah Hwy, Ringwood

Upon completion in 2020, the five-storey complex, with 74 undercover car parks, will be fully leased to the Victorian government.

The air conditioning and ventilation system on this site are controlled by an Innotech Building Management System (BMS) complete with on-site site monitoring computer and Web Based graphical Interface software.

The system shall also be provided with Innotech ATOM Data Acquisition and Management software for trending and reporting on energy usage from various utility meters

Cortrols supplied, engineered, and commissioned an Innotech Control System for the control and monitoring of

  • BACnet HLI connection with Eighty-Six (86) Indoor VRF Units
  • Thirty-Four (34) Outside Air Fans
  • Fifteen (15) Exhaust Fans
  • Six (6) Toilet Exhaust Fans
  • Four (4) Relief Exhaust Fans
  • Four (4) Supply Air Fans
  • Carpark Ventilation System with CO Control
  • Five (5) Comms Room AC Split Units
  • Low-level Interface with FIP
  • Low-level Interface with Fire services
  • Low-level Interface with Civil services
  • Low-level Interface with Hydraulics services
  • Low-level Interface with Lift services
  • Nine (9) Low-level Pulse Water Meter
  • Weather Station
  • Modbus HLI connection with Twenty-Four (24) Multi-function Power Meters